YPF

UG-02 Battery Adjustment

The entire plant was channeled for instrumentation and electricity. Instruments were supplied, calibrated, mounted, and connected in the UG-02 battery. Additionally, a new 33kV SET with a 500KVA transformer and a low-voltage distribution board was constructed.

YPF

2VM Aqueduct Expansion – CD 48

Provision, calibration, mounting, and connection of instruments in the water injection treatment plant for secondary recovery. Capacity was increased with new pumps and a 33kV SET with two new 1MVA transformers each.

YPF

CCTV and Anti-Intrusion

The project includes detailed engineering, supply procurement, construction, mounting, testing, and commissioning of the CCTV and anti-intrusion system using sensor cables and video analytics at the General Belgrano plant.

AESA

Electrical and Instrumentation Mounting

The scope includes the Washing, Drying, and Classification plants, covering mountings, identifications, instrumentation connections, channeling, pre-commissioning, and commissioning for early start-up (Stage 0) of the “BON” Project.

AESA

Electrical and Instrumentation Mounting

Mounting, identification, and connection of MT and BT cables, instrumentation, channeling, pre-commissioning, commissioning, testing, and assistance in the start-up of the Crude Treatment Plant in Añelo, Loma Campana Block, Neuquén.

YPF

Automation and CCTV Monitoring System

Engineering development and execution of work to manage operations for reception, control, weighing, unloading, surveillance, and complementary activities related to hazardous waste treatment (liquids and/or sludges).

CAPAC SRL

Primary Gas Separation Unit

Detailed engineering, supply procurement, construction, testing, and start-up assistance for an Early Production plant for gas separation at the temporary USP-PDY facility, Pampa de la Yegua, Neuquén.

YPF

Control and Safety System for FLARGENT Furnace

Development and integration of subsystems with specialized labor, materials, hardware, mounting, testing, and Hazop and Sil studies. Provided materials, equipment, data acquisition system configuration, testing, and start-up assistance.

YPF

Cruz de Piedra Project

Construction of 3 buried pipelines crossing the Mendoza River to connect Cruz de Piedra 2 and Cruz de Piedra 1 batteries. Includes engineering, electrical connections, testing, pre-commissioning, commissioning, and start-up assistance.

ORO PLATA S.A.

Cerro Negro Project

Control Point operates at the Vein Zone camp with a base of 3 offices, 2 calibration laboratories, 3 warehouses, and 1 tool room. The installation includes power systems, satellite communications, and accommodations for operational personnel.

Vale

Security Monitoring System

The system provides the operator with visual information about the drilling equipment operation areas, reducing risks associated with human presence. Utilizes Pelco technology for optimal monitoring and automatically displays images of areas with emergency signals.

Aramark

Cold Room Camera Supervision

The system allows real-time viewing of temperatures and electrical variables, with trend records, alarms, and events. Utilizes a Siemens S7-1200 PLC with an integrated web server to create a mini SCADA accessible via the internet, without additional hardware.

Barrick

Remote Monitoring System

Engineering development, material supply, and construction for a monitoring and control system in water treatment, effluent treatment, power generation plants, and others. Includes fiber optic communications, SCADA programming, calibration, and start-up.

YPF

Technological Upgrade of Pipeline Security

Development of the SCADA control and supervision system for 18 shut-down valves located at the header and along the pipeline. Includes the integration of instruments and actuators for effective and secure control.

Petersen

Instrumentation, Control, and Supervision of Fuel Loading Islands

Development of the control, supervision, and SCADA system for the fuel terminal, covering automatic process control, communication with the corporate network, valve supervision, screen animation, and data acquisition for loading islands.

SKANSKA

Control and Supervision of Pumping Station

Development of the control, supervision, and SCADA system for booster pump stations, covering electric pumps